24/7 emergency roof repairCall (405) 420-9580

New Roof Installation

New construction and additions, decked and dried in properly the first time so the roof is not the thing that fails on a brand new build.

What This Covers

New construction and additions get dried in properly and detailed before anything decorative goes on. The two things that decide whether a new roof lasts are how the penetrations are flashed and whether the attic can breathe, and both are easier to get right on a new build than to fix later.

Signs You Need This Service

  • New construction or an addition needing its first roof
  • A garage, shop, or patio cover being tied into an existing roofline
  • A re-deck after a structural change

Materials & Methods

  • Shingle, standing seam metal, or low-slope membrane depending on pitch
  • Balanced intake and ridge ventilation sized to the attic volume
  • Properly stepped flashing at every wall and chimney tie-in

What to Expect

  1. 01We coordinate with your builder's schedule so the deck is not left open
  2. 02Dry-in the same day the deck is ready
  3. 03Final walk with photographs of the flashing details before they are covered

The Layers of a New Roof

What a complete roof system is made of
Roof TypeLifespanCommon IssuesRepair Complexity
DeckingLife of the houseRot, delamination, wide plank gapsMust be sound before anything goes on
UnderlaymentMatches the roofSynthetic tears less than feltIce and water shield at eaves and valleys
Flashing20 to 30 yearsMost leaks start here, not in the fieldNever reuse old flashing on a new roof
VentilationLife of the roofUndersized intake is the usual faultCheapest to get right during install

What it looks like

New Roof Installation in Oklahoma City

Free Inspection — (405) 420-9580

Why EVZone

Why Oklahoma City homeowners call us back

Local crews, straight answers, and a jobsite left cleaner than we found it.

  • Local crews, here after the storm chasers leave

  • We meet your adjuster on the roof

  • Free documented inspections

  • Magnetic nail sweep before we leave

  • Straight answers, even when the answer is no

Questions

New Roof Installation Questions

Can you work to my builder's schedule?

Yes. We plan around when the deck is ready so it is not left open to weather, and dry it in the same day.

What roof types do you install on new construction?

Shingle, standing seam metal, or low-slope membrane, chosen by pitch and by what the building actually needs rather than by what is quickest.

Do you handle the permit on new work?

Yes. We pull the roofing permit and schedule the inspection.

Why does ventilation matter on a brand new roof?

Because it is far cheaper to get right now than to retrofit later, and an under-ventilated attic will shorten the life of a roof that is otherwise perfect.

Do you roof detached garages and shops?

Yes, and we quote them separately so you can see what each structure costs.

Service areas

Where we work

Pick your city for local storm history, permit notes, and what roofs are like in your area.

Request a free inspection

Tell us what your roof is doing and we will call you back to get on the schedule.

We use your details to contact you about your roof. We never sell your information.